Operations Clause 8

    3 min read

    Speak to an Expert

    +1 (555) 123-4567
    Email Us →
    Back to Blog

    8.2 Requirement Review — Protecting Revenue Before Production

    8.3 Design and Development

    Validation = Proving it works in real production conditions. Clause 8.3 requires both.

    8.4 Supplier Control — Protecting Production from Upstream Risk

    A supplier evaluation scorecard showing quality, delivery, responsiveness, and risk ratings.

    8.5 Production & 8.6 Release & 8.7 Nonconforming Outputs

    Are Your Shop Floor Controls Based on Discipline — or Habit?